Casterton Dam, Wannon Water, $1,000,000
The completion of this 7 meg dam in regional Victoria, required demolition and rebuilding of the entire dam structure (10,000 cu.m). 500 sq.m of liner was installed as well as over 1 km of 375 water pipe and mechanical valves. The top of the dam included an edge strip and access road. A floating liner was installed over the filled dam.